AVR West tunnel frame almost completed and ready to be pushed into slot. The frame builders are Richard on the left with Bill taking a critical measurement and Norm holding up the side. Others who assembled the frame were Rob and Fred. After final assembly the structure will be pushed into the slot and wrapped in poly before backfilling the excavation. Lower picture shows completed crossing signs plus mile post signs. Two activities on Saturday May 17th, 2003 at the Assiniboine Valley Railway.