AVR END OF CONSTRUCTION FOR SUMMER OF 2001. NEW TRACK GOES OVER A 20 FOOT BEAM BRIDGE AFTER GOING THROUGH EAST TUNNEL. THE DITCH UNDER THE BRIDGE LINES UP WITH THE NEW CULVERT.