THE NEW ENGINE HOUSE STARTING TO TAKE SHAPE FOR THE ASSINIBOINE VALLEY RAILWAY. MOST ACTIVE MEMBERS OF THE AVR HAVE HAD A HAND IN ITS CONSTRUCTION. 

THIS PAGE IS UNDER CONSTRUCTION.  MORE PICTURES WILL BE ADDED.

BY FIRST SNOW THE BUILDING WAS CLOSED IN. ONCE THE CHRISTMAS RUN WAS OVER THE INSULATION ARRIVED JANUARY 2005
AVR ENGINE HOUSE STUDS.jpg (33159 bytes)VIC WAS IN CHARGE OF ELECTRICAL WITH HELP FROM OTHER MEMBERS. NOV 2004 TO APRIL 2005 CLICK ON PICTURE TO ENLARGE
AVR ENGINE HOUSE BILL INSULATES.jpg (25331 bytes)BILL WAS THE PRINCIPAL INSULATOR WITH SOME HELP FROM OTHER MEMBERS. JANUARY & FEBRUARY 2005 CLICK ON PICTURE TO ENLARGE
AVR ENGINE HOUSE DRYWALL COMPLETE.jpg (25846 bytes)VIC AND GIL WERE THE PRINCIPAL BOARDERS WITH HELP FROM OTHER MEMBERS FROM TIME TO TIME. MARCH 2005 CLICK ON PICTURE TO ENLARGE
AVR ENGINE HOUSE DRYWALL & TAPE.jpg (19621 bytes)BILL WAS THE TAPER ON THE PROJECT. MARCH 2005 CLICK ON PICTURE TO ENLARGE
AVR ROB PAINTS ENGINE HOUSE.jpg (20964 bytes)ROB USES HIS POWER ROLLER TO PAINT CEILING AND WALLS, APRIL 2005 CLICK ON PICTURE TO ENLARGE
AVR ENGINE HOUSE NEW LIGHTS.jpg (20492 bytes)ENGINE HOUSE LIGHTS INSTALLED APRIL 2005 CLICK ON PICTURE TO ENLARGE
AVR ENGINE HOUSE BILL PAINTS FLOOR.jpg (19554 bytes)BILL PAINTS FLOOR OF NEW ENGINE HOUSE. CLICK ON PICTURE TO ENLARGE
AVR ENGINE HOUSE AT WORK.jpg (59961 bytes)2007 SHOT OF A WORKING MACHINE SHOP IN THE ENGINE HOUSE. CLICK ON PICTURE TO ENLARGE
   
   
MEMBERS WHO HELPED WITH THE BUILDING WHERE, BILL, PETER, LEN, ED, DWIGHT, RICHARD, DAVID, BARRY, ROB, JIM, GIL, FRED, NORM, VIC, WILLIAM, DAN AND BRIAN  

PAGE NEW ON MARCH 28TH, 2005 BY BILL TAYLOR OF WINNIPEG. MODIFIED FEBRUARY 2ND 2008